IMS Policy

IMS Policy

IMS Policy (Integrated Management Systems: Q(L)MS, EMS and OMS) is an integral part of our business policy and is based on a strict compliance with the regulations, laws and standards: ISO 9001, ISO 14001, OHSAS 18001 and ISO/IEC 17025.

See IMS policy

In addition to design and establishing the Integrated Management Systems in our MMI, we provide the complete consulting services to the others because we have a huge experience and a positive reputation with several companies that are successfully certificated.

Certificates

Accreditations of the Institute

Ministry of Education, Science and Technological Development

Accreditation for NIO No. 660-01-00152/2016-14 of 15/12/2016

Ministry of Agriculture and Environmental Protection

Authorization by Solutions for:

Licenses

P010G1 projects for construction structures for high dams and accumulations filled with water, tailings or ash for which the technical monitoring  is prescribed
P010G3 hydro-technical projects for high dams and accumulations filled with water, tailings or ash for which the technical monitoring is prescribed
P040G1 projects for construction structures of the basic and processing chemical industry facilities, ferrous and non-ferrous metallurgy, leather and fur processing facilities, rubber processing facilities, pulp and paper production facilities and facilities for processing of non-metallic mineral raw materials that are built outside the exploitation fields defined by  the law
P040M3 projects for transport means, warehouses and mechanical structures and technologies for the basic and processing chemical industry facilities, ferrous and non-ferrous metallurgy facilities, leather and fur processing facilities, rubber processing facilities, pulp and paper production facilities and facilities for processing of non-metallic mineral raw materials, except for facilities for the primary processing of ornamental and other stone, in accordance with the capacities defined in the Regulation on establishing a list of projects for which an impact assessment is mandatory, and a list of projects for which an assessment of the environmental impact may be required
P040E4 projects for control the electromotive drive automatics, measurement and regulation for facilities of the basic and processing chemical industry, facilities of ferrous and non-ferrous metallurgy, leather and fur processing facilities, rubber processing facilities, pulp and paper production facilities and facilities for processing of non-metallic mineral raw materials, except facilities for the primary processing of ornamental and other stone, in accordance with the capacities defined in the Regulation on establishing a list of projects for which an impact assessment is mandatory, and a list of projects for which an assessment of the environmental impact may be required
P041T1 projects of technological processes for facilities of the basic and processing chemical industries
P042T1 projects of technological processes for facilities of ferrous and non-ferrous metallurgy
P046T1 projects for technological processes for facilities of processing of non-metallic mineral raw materials that are built outside the exploitation fields defined by the law governing the mining and geological explorations, except the facilities for the primary processing of ornamental and other stone
P052M1 projects of thermo-technical, thermo-energetic, process and gas installations for the thermal power plants of 10 MW and more
P100M1 projects of thermo-technical, thermo-energetic, process and gas installations for treatment of hazardous waste by incineration, thermal and/or/physical, physical-chemical, chemical methods, as well as the central warehouses and/or landfills for disposal of hazardous waste
P100T1 projects of technological processes for plants for treatment of hazardous waste by incineration, thermal and/or physical, physical-chemical, chemical methods, as well as the central warehouses and/or landfills for disposal of hazardous waste
P102M1 projects of thermo-technical, thermo-energetic, process and gas installations for plants for treatment of non-hazardous waste by incineration or chemical methods with a capacity exceeding 70 t per day
P102T1 projects of technological processes for treatment of non-hazardous waste by  incineration or chemical processes, with a capacity of more than 70t per day

Software Licenses