The Mining and Metallurgy Institute Bor for more than half a century of existence and work has brought together the quality and reliability in the scientific research work, designing, engineering and consulting, experimental and special production, testing of materials, equipment, devices of industrial facilities, research-development and other services, quality control of products, materials and production processes, quality control of living and working environment, presence on domestic and foreign markets, in the fields of: metallurgy, mining, geology, chemical control, informatics, industrial informatics, engineering, mechanical engineering, electrical engineering, electronics, civil construction and publishing.

During its previous extensive work, the Institute has gained the positive references for implementation the investment works in the fields of mining and metallurgy of copper and precious metals, non-metals and coal in the following foreign countries: India, Burma, Iran, Sierra Leone, Armenia, Turkey, Zambia, Pakistan, Macedonia, Bosnia and Herzegovina and Montenegro.
The most important facilities which the Institute built abroad are: Copper Electrolysis “KETRY”, India; Copper Smelter “KETRY”, India; Gold Mine, Flotation Plant and Smelter “KYAUKPAHTOE”, Burma; Diamond Mine “KOIDU”, Sierra Leone, Africa; Plant for Anode Slime Treatment “YEREVAN” Armenia; Plant for Anode Slime Treatment “SARKUYSAN”, Turkey; Copper Mine and Flotation Plant “BUČIM“ Radoviš, Macedonia; Copper Mine, Flotation Plant and Tank House “SAR CHESMEH”, Iran; Copper Mine and Flotation Plant “MONYWA”, Burma; Copper Mine, Flotation Plant and Smelter “SAINDAK”, Pakistan; Anode Slime Treatment Plant, Zambia; Ferronickel Mine and Flotation Plant “FENI”, Kavadarci, Macedonia; Construction of the Copper Smelter and Refinery from brass scrap, Iraq.

The Latest References

  • RESEARCH ON THE INTEGRATION SYSTEM OF SPAT IAL ENVIRONMENT ANALYSES AND ADVANCED METAL RECOVERY TO ENSURE SUSTAINABLE RESOURCE DEVELOPMENT. SATREPS-JAPAN. Client: JICA¸ Japan 2015-2020.
  • UE FRAMEWORK PROGRAM FOR RESEARCH AND INNOVATION. HORIZON 2020 CALL: H2020-SC5-11E-2015 TOPICS SC5-11E-2015. PROJECT: “INTMET-INTEGRATED INNOVATIVE METALLURGICAL SYSTEM FOR EFFICIENT TREATMENT OF POLYMETALLIC, COMPLEX AND LOW-GRADE ORE AND CONCENTRATE.” European Union, Duration period: 01/02/2016 – 01/02/2019.
  • DEVELOPMENT OF THE MAIN DESIGN FOR RELOCATION THE DTO SYSTEM ON THE INTERNAL LANDFILL OF THE OPEN PIT POTRLICA. Client: RU A.D. Pljevlja, Montenegro, 2016.
  • MAIN MINING DESIGN OF THE OPEN PIT GACKO – CENTRAL FIELD FOR A CAPACITY OF 2.3 × 106 t/year OF RUN-OF-MINE COAL. Client: ZP Mine and TPP Gacko, Republic of Srpska, 2016.
  • SUPPLEMENTARY MINING DESIGN FOR COAL EXPLOITATION AT THE OPEN PIT “POTRLICA’’ – PLJEVLJA FOR THE PERIOD 2015-2019. Client: Coal Mine A.D. Pljevlja, Montenegro, 2015.
  • SUPPLEMENTARY MINING DESIGN FOR EXPANSION THE FLOTATION TAILING DUMP VELIKI KRIVELJ TO THE ZERO FIELD. Client: RTB BOR GROUP – RBB DOO BOR, SERBIA, 2015.
  • STRATEGY OF MINING AND TECHNOLOGICAL OPENING, DEVELOPMENT, OPTIMIZATION AND MAINTENANCE A CONTINUITY OF THE COAL PRODUCTION WITH INTRODUCTION THE PROCESS OF COAL ENRICHMENT BY DRY GRAVITY SEPARATION AT THE OP GACKO. Client: ZP Mine and TPP Gacko a.d. Gacko, Republic of Srpska, 2015.
  • SUPPLEMENTARY MINING DESIGN FOR TRANSPORT AND DISPOSAL – DUMPING OF SLAG, ASH AND GYPSUM OF THE TPP BOGUTOVO SELO – UGLJEVIK. Client: Mixed Holding ELECTRIC POWER INDUSTRY OF THE REPUBLIC OF SRPSKA, Subsidiary Company MINE AND TPP UGLJEVIK AD UGLJEVIK, Republic of Srpska, 2015.
  • MAIN MINING DESIGN FOR EXCAVATION AT THE OP OF LIMESTONE “ČOKOĆE“. Client” HOLCIM (Serbia) doo, Serbia, 2014.
  • PROMOTING NEW ECOLOGIC FILLER ALLOYS FOR SOLDERING, BASED ON THE NON-FERROUS OF THE ROMANIAN-SERBIAN CROSS-BORDER AREA – (ECOSOLDER). IPA Cross-Border Cooperation Program Serbia – Romania 2013-2014.
  • CREATION OF A DATABASE OF POLLUTANTS FROM INDUSTRIAL WASTE IN A TRANSBOUNDARY ASPECT AND A LOGICAL FRAMEWORK FOR PROBLEM SOLVING. IPA Cross-Border Cooperation Program Serbia – Bulgaria 2011-2013.
  • MAIN MINING DESIGN OF EXPLOITATION THE QUARTZ SAND DEPOSIT “BOŠNJANE“. Client: HOLCIM (Serbia) doo, Serbia, 2012.
  • SUPPLEMENTARY MINING DESIGN OF RECONSTRUCTION THE FLOTATION PLANT VELIKI KRIVELJ IN ORDER TO INCREASE THE CAPACITY FROM 8.0 X 106 TO 10.6 X 106 TONS OF WET ORE ANNUALLY. Client: RTB Bor – Group, RBB, Serbia, 2012.
  • PREFEASIBILITY STUDY OF REOPENING THE COPPER MINE KONYRAT – KAZAKHMYS, KAZAKHSTAN 2011.
  • SUPPLEMENTARY MINING DESIGN OF TRANSPORT SYSTEM FOR CONNECTING THE PRIMARY CRUSHER FROM THE SYSTEM OF OVERBURDEN WITH A STACKER SYSTEM FOR THE PRIMARY CRUSHED ORE AT THE OPEN PIT VELIKI KRIVELJ. Client: RTB Bor – Group, RBB, Serbia, 2010.
  • GEOLOGICAL POTENTIAL OF THE Cu-U-Co DEPOSIT, CHIPUPUSHI MINE, ZAMBIA, 2009.
  • FEASIBILITY STUDY OF REOPENING THE CU-CO MINE, MINE KILEMBE, UGANDA, 2008.

Latest news

FIRMA OD POVERENJA

„Borski institut – ponos Srbije!“

.

INFORMATOR O RADU

katastar rudarskog otpada