{"id":2717,"date":"2016-11-16T09:39:07","date_gmt":"2016-11-16T09:39:07","guid":{"rendered":"http:\/\/irmbor.co.rs\/en\/services\/engineering\/rudarstvo\/"},"modified":"2022-05-10T12:23:08","modified_gmt":"2022-05-10T12:23:08","slug":"mining","status":"publish","type":"page","link":"https:\/\/irmbor.co.rs\/en\/services\/engineering\/mining\/","title":{"rendered":"Mining"},"content":{"rendered":"<p>The Mining and Metallurgy Institute Bor provides the following services in the field of mining:<\/p>\n<ul>\n<li>Study research (development and innovation) and design the technical-technological processes in operation in the surface and underground mining of solid mineral resources &#8211; coal, metallic and non-metallic mineral resources;<\/li>\n<li>Development the studies, projects, analyses, expertise, programs and elaborates for the deposits of solid mineral resources;<\/li>\n<li>Development the project-technical documentation:<br \/>&#8211; Main Mining Design for exploitation the deposits of solid mineral resources<br \/>&#8211; Supplementary Mining Design for exploitation the deposits of solid mineral resources<br \/>&#8211; Simplified Mining Design for exploitation the deposits of solid mineral resources<br \/>&#8211; Main Mining Design for permanent suspension of works<\/li>\n<li>Development the project-technical documentation of all project levels in the exploitation of solid mineral resources, includes the all phases of technological process:<br \/>&#8211; Opening and development,<br \/>&#8211; Selection the excavation technology, with the all technological phases: drilling, blasting, loading, transportation, mineral processing and disposal,<br \/>&#8211; Drainage,<br \/>&#8211; Supply with drive energy and water,<br \/>&#8211; Communication connections and alarm signaling,<br \/>&#8211; Occupational health and safety measures,<br \/>&#8211; Establishing and organization of the exploitation process,<br \/>&#8211; Techno-economic assessment the feasibility of construction.<\/li>\n<li>Technical control of the project-technical documentation<\/li>\n<li>Technical acceptance of the mining facilities<\/li>\n<li>Design supervision<\/li>\n<li>Monitoring operations for the exploitation of deposits<\/li>\n<li>Control the work realization<\/li>\n<li>Engineering and consulting services in the exploitation of solid mineral resources<\/li>\n<li>Improvement the modern systems, methods and means of work<\/li>\n<li>Monitoring the gas parameters of the underground facilities<\/li>\n<li>Control the unexplored and unsafe underground facilities<\/li>\n<li>Development the environmental impact studies<\/li>\n<li>Monitoring the impact of exploitation on the environment<\/li>\n<\/ul>\n<h4><strong>References<\/strong><\/h4>\n<p><strong>UNDERGROUND MINING<\/strong><\/p>\n<ul>\n<li>MAIN MINING DESIGN OF EXPLOITATION OF ORE FROM COPPER AND GOLD DEPOSITS \u010cUKARU PEKI &#8211; UPPER ZONE, Client Serbia Zijin Mining d.o.o. Bor, 2021<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF EXPLOITATION OF ORE FROM COPPER AND GOLD DEPOSITS \u010cUKARU PEKI &#8211; UPPER ZONE ABOVE elevation K-80 M, Client Serbia Zijin Mining d.o.o. Bor, 2021<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF THE CONSTRUCTED CONDITION OF THE DEPARTMENT OF OPENING OF THE \u010cUKARU PEKI DEPOSIT &#8211; UPPER ZONE UP TO ELEVATION K-260 M, Client Serbia Zijin Mining d.o.o. Bor, 2021<\/li>\n<li>TECHNICAL MINING DESIGN CHANGE OF METHOD OF EXCAVATION OF ORE BODY T3 IN JAMA BOR, Client Serbia Zijin Copper d.o.o. Bor, 2021<\/li>\n<li>TECHNICAL MINING DESIGNS OF MAKING FOUR SHAFTS AND A DECLINE, Client Serbia Zijin Copper d.o.o. Bor, 2021<\/li>\n<li>TECHNICAL MINING DESIGN OF THE EXHAUST VENTILATION SHAFT, Client Serbia Zijin Mining d.o.o. Bor, 2021<\/li>\n<li>STUDY OF THE INFLUENCE OF SUBLEVEL CAVING MINING METHOD IN THE ORE BODY T3 ON THE LAND SURFACE, Client Serbia Zijin Copper doo Bor, 2021.<\/li>\n<li>MAIN MINING DESIGN OF OPENING THE \u010cUKARU PEKI DEPOSIT &#8211; UPPER ZONE TO ELEVATION K-260 M, Client Rakita Exploration d.o.o. Bor, 2020<\/li>\n<li>FEASIBILITY STUDY OF EXPLOITATION OF MASSIVE SULPHIDE ORE DEPOSITS OF COPPER AND GOLD \u010cUKARU PEKI \u2013 UPPER ZONE, Client Rakita Exploration d.o.o. Bor, 2019<\/li>\n<li>MINING DESIGN ON RESEARCH OF SOLID MINERAL RAW MATERIALS IN HYDROTHERMAL SYSTEM &#8211; DEPOSIT \u010cUKARU PEKI, Client Rakita Exploration d.o.o. Bor, 2019<\/li>\n<li>MINING DESIGN ON EXPLORATION OF SOLID MINERAL RAW MATERIALS IN HYDROTHERMAL Cu-Au SYSTEM OF \u010cUKARU PEKI DEPOSIT BY DECLINES, Client Rakita Exploration d.o.o. Bor, 2018<\/li>\n<li>COPPER ORE EXPLOITATION PLAN IN RTB BOR FOR THE PERIOD 2019 &#8211; 2021 IN THE JAMA BOR UNDERGROUND MINE, Client Serbia Zijin Copper d.o.o. Bor, 2018<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF COPPER ORE EXPLOITATION FROM &#8220;T3&#8221; ORE BODY IN JAMA BOR UNDERGROUND MINE, Client RTB Bor &#8211; GROUP, RBB, Serbia, 2017<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF COPPER ORE EXPLOITATION FROM BORSKA REKA DEPOSIT ABOVE XIX HORIZON (K-235m) WITH PRESERVATION OF LAND SURFACE, Client RTB Bor &#8211; GRUPA, RBB, Serbia, 2016.<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF EXPLOITATION OF REMAINING ORE RESERVES IN ORE BODIES TILVA RO\u0160 AND P2A IN JAMA BOR UNDERGROUND MINE, Client RTB Bor &#8211; GROUP, RBB, 2014<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF FILLING THE EXCAVATED SPACE IN THE ORE BODY &#8220;T&#8221; IN JAMA BOR UNDERGROUND MINE, Client RTB Bor &#8211; GROUP, RBB, 2013<\/li>\n<li>SIMPLIFIED MINING DESIGN OF TEMPORARY CLOSURE &#8211; INSURANCE OF THE SHAFT OF THE &#8220;GINDU\u0160A&#8221; UNDERGROUND MINE, Client Deli Jovan Exploration d.o.o., Bor, Serbia, 2013.<\/li>\n<li>PROFESSIONAL SUPERVISION OF WORKS ON OPENING THE ENTRANCE TO THE RUSMAN AND GINDUS UNDERGROUND MINES (DELI JOVAN), Client Deli Jovan Exploration d.o.o., Bor, Serbia, 2012.<\/li>\n<li>TECHNICAL CONTROL OF DESIGN DOCUMENTATION SUPPLEMENTARY MINING DESIGN PERMANENT SUSPENSION OF WORKS ON SURFACE MINING \u0106IRIKOVAC &#8211; KOSTOLAC, Client Elektroprivreda Srbije, 2012.<\/li>\n<li>TECHNICAL INSPECTION, TECHNICAL-TECHNOLOGICAL SYSTEMS WITH ACCOMPANYING FACILITIES MADE ACCORDING TO THE MAIN MINING DESIGN OF EXPLOITATION OF POLYMETAL METAL ORE FROM THE DEPOSIT &#8220;RUDNIK&#8221;, RUDNIK, Client Rudnik \u201eRudnik\u201c, Gornji Milanovac, 2012.<\/li>\n<li>SUPPLEMENTARY MINING DESIGN FOR PERMANENT SUSPENSION OF WORKS IN ORE BODIES &#8220;TILVA RO\u0160&#8221; AND &#8220;P2A&#8221; AND OPERATIONAL SAFETY AND COLLECTIVE PROTECTION OF WORKERS IN JAMA BOR UNDERGROUND MINE, Client RTB Bor &#8211; GROUP, RBB, 2011.<\/li>\n<li>TECHNICAL CONTROL DURING THE MAKING OF DRP OF COPPER ORE EXPLOITATION FROM ORE BODY &#8221; T &#8221; IN JAMA BOR UNDERGROUND MINE, Client RTB Bor &#8211; GRUPA d.o.o., RBB Bor, Serbia 2010.<\/li>\n<\/ul>\n<p><strong>OPEN PIT MINING<\/strong><\/p>\n<ul>\n<li>SUPPLEMENTARY MINING DESIGN FOR EXCAVATION OF COPPER ORE IN THE VELIKI KRIVELJ DEPOSIT FOR A CAPACITY OF 23.1 MILLION TONS OF ORE ANNUALLY, Client: Serbia Zijin Copper doo Bor, 2022.<\/li>\n<li>TECHNICAL MINING DESIGN FOR EXTENSION OF EXCAVATED MATERIAL LANDFILL O1 COPPER AND GOLD DEPOSITS \u010cUKARU PEKI \u2013 UPPER ZONE, Client: Serbia Zijin Mining doo Bor, 2022.<\/li>\n<li>MAIN MINING DESIGN OF EXPLOITATION ON THE DEPOSIT POTAJ CUKA NEAR \u017dAGUBICA; Client: IRM Bor, 2021.<\/li>\n<li>SIMPLIFIED MINING DESIGN OF LANDSLIDE REHABILITATION IN THE ZONE OF FLOTATION TAILINGS OF \u010cUKARU PEKI MINE, Client: Serbia Zijin Mining doo Bor, 2021.<\/li>\n<li>TECHNICAL MINING DESIGN OF SURFACE EXPLOITATION OF RAW MATERIALS FOR CEMENT PRODUCTION ON THE \u201cTRE\u0160NJA\u201d DEPOSIT &#8211; NOVI POPOVAC, Client: CRH Srbija doo, 2021.<\/li>\n<li>TECHNICAL MINING DESIGN OF SURFACE EXPLOITATION OF RAW MATERIALS FOR CEMENT PRODUCTION ON THE \u201c\u010cOKO\u0106E\u201d DEPOSIT &#8211; NOVI POPOVAC; Client: CRH Srbija doo, 2021.<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF EXPANSION OF THE \u201cSARAKA\u201d LANDFILL OF THE VELIKI KRIVELJ OPEN PIT; Client: Serbia Zijin Copper doo Bor, 2021.<\/li>\n<li>STUDY ON THE STABILITY OF THE DESIGNED FINAL CONDITION OF THE SEVERNI REVIR OPEN PIT; Client: Serbia Zijin Copper doo Bor, 2021.<\/li>\n<li>TECHNICAL MINING DESIGN OF COPPER ORE EXCAVATION IN THE VELIKI KRIVELJ DEPOSIT IN THE PERIOD FROM 2021-2025; Client: Serbia Zijin Copper doo Bor, 2021.<\/li>\n<li>SIMPLIFIED MINING DESIGN OF EXPANSION OF LANDSCAPE B DEPOSITS OF COPPER AND GOLD \u010cUKARU PEKI; Client: Serbia Zijin Mining doo Bor, 2021.<\/li>\n<li>TECHNICAL DESIGN OF ORE EXCAVATION AT OPEN PIT SEVERNI REVIR; Client: Serbia Zijin Copper doo, Bor, 2021.<\/li>\n<li>STUDY ON ENVIRONMENTAL IMPACT ASSESSMENT OF LANDFILL FORMATION IN THE EXCAVATED AREA OF THE SURFACE MINING BRANCH KRAKU BUGARESKU CEMENTATION 1; Serbia Zijin Copper doo Bor, 2021.<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF EXCAVATION AND PREPARATION OF LIMESTONE AT THE &#8220;KRIVELJ&#8221; QUARRY; Client: Serbia Zijin Copper doo Bor, 2020<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF EXCAVATION AND PREPARATION OF LIMESTONE IN THE &#8220;ZAGRA\u0110E-5&#8221; DEPOSIT; Client: Serbia Zijin Copper doo Bor, 2020<\/li>\n<li>REPORT ON THE STABILITY OF AS BUILT CONDITION ON DAMS 1, 2 AND 3 OF THE VELIKI KRIVELJ FLOTATION TAILINGS; Client: Serbia Zijin Copper doo Bor, 2020<\/li>\n<li>STUDY ON THE STABILITY OF THE DESIGNED FINAL CONDITION OF THE JUZNI REVIR OPEN PIT; Investor: Serbia Zijin Copper doo Bor, 2020<\/li>\n<li>REPORT ON STABILITY OF THE DESIGNED FINAL CONDITION OF THE VELIKI KRIVELJ OPEN PIT; Client: Serbia Zijin Copper doo Bor, 2020<\/li>\n<li>FEASIBILITY STUDY OF EXPLOITATION OF LEAD, ZINC AND SUPPORTING USEFUL COMPONENTS IN BRSKOVO ORE DEPOSITS, Client: Brskovo Mine doo Podgorica, 2020.<\/li>\n<li>SIMPLIFIED MINING DESIGN OF TARGET DISPOSAL WITH OPEN PIT LIMESTONE &#8220;SMILJKOVA GLAVA &#8211; STUBIK&#8221; NEAR NEGOTIN; Client: Mok Promet doo Negotin, 2020<\/li>\n<li>REPORT ON THE STABILITY OF SLOPES FOR HEIGHT INCREASE OF THE FLOTATION TAILINGS DAMS IN THE COPPER MINE MAJDANPEK; Client: Serbia Zijin Copper doo Bor, 2019.<\/li>\n<li>SIMPLIFIED MINING DESIGN OF EXCAVATION ON LIMESTONE OPEN PIT &#8220;SMILJKOVA GLAVA &#8211; \u0160TUBIK&#8221; NEAR NEGOTIN; Client: Mok Promet doo Negotin, 2019<\/li>\n<li>WATER, AIR AND LAND MONITORING STUDY FOR FLOTATION TAILINGS VELIKI KRIVELJ; CLIENT: Serbia Zijin Copper doo Bor, 2019.<\/li>\n<li>DESIGN OF OSCULTATION OF GYPSUM LANDFILL FROM THE PROCESS OF FLUE GAS DESULPORATION AND &#8220;KOSTOLAC B&#8221; AT THE INTERNAL LANDFILL OF OPEN PIT &#8220;DRMNO&#8221;; Client: EPS &#8220;Electric Power Industry of Serbia&#8221; Belgrade, Branch &#8220;TE-KO Kostolac 2019&#8221; doo.<\/li>\n<li>EXPLANATION OF THE RENOVATION AND EXPANSION PLAN FOR PRODUCTION MANAGEMENT FOR 2019 IN THE MAJDANPEK, CEROVO, VELII KRIVELJ AND JAMA MINES; Client: Serbia Zijin Copper doo Bor, 2018<\/li>\n<li>CONCEPTUAL SOLUTIONS OF THE NEW PUSHBACKS FOR A CAPACITY OF 23.0 MT OF ORE ANNUALLY AT VELIKI KRIVELJ OPEN PIT AND JUZNI REVIR OPEN PIT FOR A CAPACITY OF 9.9 MT OF ORE ANNUALLY; Client: Serbia Zijin Copper doo Bor, 2018<\/li>\n<li>MINING WASTE CADASTRE OF THE REPUBLIC OF SERBIA, Client: Ministry of Mining and Energy of the Republic of Serbia, 2017<\/li>\n<li>MAIN MINING DESIGN OF EXCAVATION OF SURFACE MINING GACKO &#8211; CENTRAL FIELD FOR CAPACITY OF 2.3 MILLION TONS OF COAL ANNUALLY, Client Elektroprivreda Republike Srpske, Rudnik i termoelektrana Gacko AD, Bosnia and Herzegovina, 2016<\/li>\n<li>MAIN MINING DESIGN OF DTO SYSTEM REMOVAL TO THE INTERNAL LANDFILL OF POTRLICA SURFACE MINING, Pljevlja Coal Mine, Montenegro, 2015<\/li>\n<li>MAIN MINING DESIGN OF EXCAVATION OF MINERAL RAW MATERIALS FOR THE CEMENT INDUSTRY IN THE \u201eTRESNJA\u201c DEPOSIT &#8211; NOVI POPOVAC, Client: Holcim Srbija doo, 2014<\/li>\n<li>FEASIBILITY STUDY OF CRUSHING OF LIMESTONE AS RAW MATERIALS FOR THE CEMENT INDUSTRY OF TECHNICAL CONSTRUCTION STONE FOR COMMERCIAL NEEDS IN THE DEPOSIT OF LIMESTONE \u010cOKO\u0106E: NOVI POPOVAC, Client: Holcim Srbija doo, 2014<\/li>\n<li>SUPPLEMENTARY MINING DESIGN OF EXCAVATION AND PREPARATION OF COPPER ORE IN JUZNI REVIR OPEN PIT &#8211; COPPER MINE MAJDANPEK, Investor: RTB Bor Group, Copper Mine Majdanpek, 2013.<\/li>\n<li>MAIN MINING DESIGN OF EXPLOITATION OF QUARTZ SAND DEPOSITS BOSNJANE, Client: Holcim Srbija doo, 2012<\/li>\n<li>MAIN MINING DESIGN OF EXCAVATION AND PREPARATION OF COPPER ORE DEPOSITS VELIKI KRIVELJ FOR CAPACITY OF 10.6 MILLION TONS A YEAR, Client: RTB Bor Group, Bor Copper Mines, 2010<\/li>\n<\/ul>\n\n","protected":false},"excerpt":{"rendered":"The Mining and Metallurgy Institute Bor provides the following services in the field of mining: Study research (development and innovation) and design the technical-technological processes in operation in the surface and underground mining of solid mineral resources &#8211; coal, metallic and non-metallic mineral resources; Development the studies, projects, analyses, expertise, programs and elaborates for the&#8230;","protected":false},"author":1,"featured_media":0,"parent":123,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v15.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/irmbor.co.rs\/en\/services\/engineering\/mining\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mining - IRM Bor\" \/>\n<meta property=\"og:description\" content=\"The Mining and Metallurgy Institute Bor provides the following services in the field of mining: Study research (development and innovation) and design the technical-technological processes in operation in the surface and underground mining of solid mineral resources &#8211; coal, metallic and non-metallic mineral resources; Development the studies, projects, analyses, expertise, programs and elaborates for the...\" \/>\n<meta property=\"og:url\" content=\"http:\/\/irmbor.co.rs\/en\/services\/engineering\/mining\/\" \/>\n<meta property=\"og:site_name\" content=\"IRM Bor\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-10T12:23:08+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/irmbor.co.rs\/en\/#website\",\"url\":\"https:\/\/irmbor.co.rs\/en\/\",\"name\":\"IRM Bor\",\"description\":\"Institut Bor\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/irmbor.co.rs\/en\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"http:\/\/irmbor.co.rs\/en\/services\/engineering\/mining\/#webpage\",\"url\":\"http:\/\/irmbor.co.rs\/en\/services\/engineering\/mining\/\",\"name\":\"Mining - IRM Bor\",\"isPartOf\":{\"@id\":\"https:\/\/irmbor.co.rs\/en\/#website\"},\"datePublished\":\"2016-11-16T09:39:07+00:00\",\"dateModified\":\"2022-05-10T12:23:08+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/irmbor.co.rs\/en\/services\/engineering\/mining\/\"]}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/pages\/2717"}],"collection":[{"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/comments?post=2717"}],"version-history":[{"count":9,"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/pages\/2717\/revisions"}],"predecessor-version":[{"id":4553,"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/pages\/2717\/revisions\/4553"}],"up":[{"embeddable":true,"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/pages\/123"}],"wp:attachment":[{"href":"https:\/\/irmbor.co.rs\/en\/wp-json\/wp\/v2\/media?parent=2717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}